Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9701460
- Product Categories
- Friendly Links
Information Name: | Supply Nanjing Gasoline Generator | Gasoline Generator installation check procedure |
Published: | 2013-10-25 |
Validity: | 0 |
Specifications: | |
Quantity: | 10000.00 |
Price Description: | |
Detailed Product Description: | Nanjing Gasoline Generator | Gasoline Generator Gasoline Generator installation installation check procedure checks the following steps: 1) the coupling bearing generator, the generator to adjust the height of the center slightly to the center and you have some diesel, so diesel engine flywheel the weight of the bearing will not be transferred to the generator or generator bearing the extra weight of the flywheel to bear, is not conducive to the formation of the oil film bearing, resulting in fever, and even burned bearings. The coupling of these generators can not take anything heavy. 2) AC generator and diesel generator coupled to require coupling parallelism and concentricity of less than 0.05mm. The actual use of these requirements can be a little bottom, about 0.1mm or less, is too large back affect the normal operation of the bearing, resulting in damage to the coupling good with locating pins fixed. Coupled retest before installation situation. 3) Install gasoline generator, to ensure unobstructed cooling air inlet and exhaust to avoid secluded hot air re-entering the generator. If ventilation is covered with blinds, the window should be facing down, in order to meet the requirements of protection class. 4) Press the schematic or wiring diagram, select the appropriate power cable, with copper fittings for wiring, copper fittings and bus, bus and bus fastening, its joints local clearance of not more than 0.05mm, the distance between the wires is not greater than 10mm, need to install the necessary ground. 5) Single bearing generator mechanically coupled to pay special attention to the air gap between the rotor and the stator to be uniform. 6) If the power supply system of the generator neutral point connected to each other, or the generator neutral point and neutral point of the transformer and the load is connected, the unit will run in neutral outlet 3 times the frequency of the midline current. Therefore, the operation must be present in the load conditions, the generator neutral current measured. In order to run the generator from overheating, which may not exceed the generator line current bottom 50% of the rated current. Midline electricity is too large, the center line should be installed in the line reactor is limited. 7) gasoline generator terminal box terminal head hit a U, V, W, N imprint, he does not represent the actual phase sequence depends on the direction of rotation. UVW printed on the certificate indicates clockwise rotation of the actual phase sequence, VUW means counterclockwise rotation of the actual phase sequence. Nanjing Gasoline Generator | Gasoline Generator installation check procedure |
Admin>>>
You are the 12013 visitor
Copyright © GuangDong ICP No. 10089450, Borch Nanjing Engineering Equipment Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 12013 visitor
Copyright © GuangDong ICP No. 10089450, Borch Nanjing Engineering Equipment Leasing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility